9/2/01- Hmmmm....
I have found that if I feel obliged to get on with something that I don't want to do, i.e. getting down to some illustration work, then I will much more readily get on with lots of other tasks, hence the recent burst of energy with KC1. I have got the rams, valves, regulator, (currently being adapted at work), have welded up extra struts to the chassis, knocked up a lift arm and covered the little fellow in lexan. I've mounted the ball transfer units and even managed to negotiate with M&P over the chains and sprockets (still haven't arrived though). I have mounted all the electronics and made up much neater brackets for the pot/servo connection. The current aim is to get a single ram operating a lift arm, and maybe set up a surrender flag with the other.
I had fun working out how the solenoid valve operates, and connected it to the battery the wrong way causing a huge explosion and much melted wire, Graham Leacock sorted me out and I removed a surge voltage protector and lamp from the solenoid housing. soldering the connections direct.
I thought I'd have plenty of room but yet again it's going to be a real squeeze getting everything in, especially bits like the valves which are such an awkward shape.
We have also got the laser running.... photos to follow.
Comments